FG CALCULATORExplore tools ↗
Home / Guides / Cubic Feet vs. Cubic Yards
FG Calculator Guide

Cubic Feet vs. Cubic Yards

The one volume conversion every material order needs

You will measure your project in feet, but the supplier will quote you in yards — and mixing the two up is the most expensive beginner mistake in DIY estimating. This guide walks through the one conversion you need, with a worked example you can follow along.

Step-by-step: convert with confidence

  1. Measure in feet first. Length × width × depth (in feet) gives you cubic feet.
  2. Remember the magic number: 27. One cubic yard = 27 cubic feet (3 × 3 × 3).
  3. Divide by 27. Cubic feet ÷ 27 = cubic yards — the unit suppliers quote.
  4. Watch your depth units. A 4-inch slab is 4 ÷ 12 = 0.333 ft. Mixing inches and feet is the #1 mistake.
  5. Sanity-check the size. A full pickup bed holds roughly 2 cubic yards — if your answer says 40, recheck.
Piles of gravel aggregate measured in cubic yards

Example calculation

A concrete slab is 20 ft × 15 ft × 4 in.
Depth in feet: 4 ÷ 12 = 0.333 ft.
Cubic feet: 20 × 15 × 0.333 = 100 ft³.
Cubic yards: 100 ÷ 27 = 3.70 yd³ → +5% waste = 3.89 yd³ to order.

Quick reference

Open the Concrete Calculator →

Also handy: Gravel Calculator · Mulch Calculator · Unit Conversions

Frequently asked questions

How many cubic feet are in a cubic yard?

Exactly 27. Picture a cube 3 feet on each side: 3 × 3 × 3 = 27 cubic feet. To convert cubic feet to cubic yards, divide by 27.

Why do suppliers quote cubic yards when I measured in feet?

Bulk materials like ready-mix concrete, gravel and mulch are sold by the truckload, and trucks are rated in cubic yards. Knowing the conversion lets you check a supplier's quote against your own measurements.

Does the concrete calculator handle this conversion for me?

Yes — enter dimensions in feet and inches and it converts to cubic yards automatically. This guide is for sanity-checking supplier quotes and for materials where you are doing the math by hand.

These guides are general information. Actual material requirements depend on project details and supplier specifications.